Scrubber Design Calculation Excel Best ((free)) Jun 2026

To help me tailor this layout or provide specific equations, tell me: What are you designing (Packed Bed or Venturi)? What is the target pollutant you need to remove? If you have a specific engineering correlation you want written out into an Excel formula, let me know! Share public link

Customization: You can easily add "What-If" scenarios to see how the design reacts to a 20% increase in gas flow.

For venturi scrubbers, the online allows you to design systems using the Hesketh pressure drop equation and Johnstone collection efficiency correlations – a valuable reference for validating your own spreadsheet calculations. scrubber design calculation excel best

Vf=Y⋅g⋅ρlFp⋅ρg⋅μl0.2cap V sub f equals the square root of the fraction with numerator cap Y center dot g center dot rho sub l and denominator cap F sub p center dot rho sub g center dot mu sub l to the 0.2 power end-fraction end-root Determine Cross-Sectional Area ( ) and Diameter (

Gas Outlet (y2) Liquid Inlet (x2) │ │ ▼ ▼ ┌──────────────────────────────┐ │ │ │ Packed Bed Zone │ Z = │ │ ◄── Height (Z) = HTU × NTU │ (Gas/Liquid Mass Transfer) │ │ │ └──────────────────────────────┘ │ │ ▼ ▼ Gas Inlet (y1) Liquid Outlet (x1) To help me tailor this layout or provide

BHP=Qg×ΔP6356×Fan EfficiencyBHP equals the fraction with numerator cap Q sub g cross cap delta cap P and denominator 6356 cross Fan Efficiency end-fraction

Closing note Recommend validating Excel results with vendor data or detailed simulation (e.g., Aspen, gPROMs) before final design. Share public link Customization: You can easily add

If you want an accessible "paper" (PDF guide) paired with a functional Excel tool, this is a community favorite.

Create a table with: | Packing Type | Material | Size (in) | Fp (ft²/ft³) | a (m²/m³) | ε (void fraction) | |--------------|----------|-----------|--------------|-----------|-------------------| | 1" Pall ring | PP | 1 | 56 | 207 | 0.92 | | 2" Intalox | Ceramic | 2 | 40 | 102 | 0.74 |

Every scrubber calculation sequence begins with raw process data. You must gather and verify these input values before starting your spreadsheet equations. Gas Stream Properties Volumetric Flow Rate ( Qgcap Q sub g

): Apply your safety/derating factor (e.g., 60% of flooding) to find the design velocity (